-5%

Durable Dog Tracking Leash Nylon Long Leads Rope Pet Training Walking Leashes 3m 5m 10m 20m For Medium Large Dogs Non-slip

(10 customer reviews)
Availability:

576 in stock


$17.08$35.90

Shipping:
[free] AliExpress Standard Shipping (29 days) - United States (US)
Ship to:

Shipping Method:
Estimated Delivery
Cost
Tracking
Carrier
29 days
free
yes
AliExpress Standard Shipping
20-40 days
$2.73
yes
Cainiao Expedited Standard
12-21 days
$22.09
yes
EMS
6-13 days
$31.65
yes
DHL
5-8 days
$34.76
yes
UPS Express Saver
5-8 days
$35.95
yes
Fedex IP
11-17 days
$38.48
yes
UPS Expedited

Durable Dog Tracking Leash Nylon Long Leads Rope Pet Training Walking Leashes 3m 5m 10m 20m For Medium Large Dogs Non-slip

Color: Coffee/Beige

Size: 3m/5m/10m/20m

Sturdy metal swivel hook,compliment any collar or harness

These extra long training leash are designed for Long distance training.

Works great for tracking work like searching/hunting or training like recall/distance commands. And more freedom of movement on Long-distance outdoor activities.

Size:

SKU: LQCMRU1M6H79 Category:

Based on 10 reviews

4.8 overall
8
2
0
0
0

Add a review

  1. Shopper

    Great leash! In winter, the snow will be well visible (I took a dark brown), for the summer we have khaki) light and durable!

    Shopper

  2. Z***s

    Excellent stuff

    Z***s

  3. A***o

    The leash is not very comfortable. He is round and cuts his hand with tension. After the first walk, the dog did not break. Threads cracked, but withheld.

    A***o

  4. P***k

    very high quality , strong and soft on hands

    P***k

  5. G***x

    Received quickly looks good quality 35 kg heavy duty dog hook

    G***x

  6. v***v

    good, looking strong.

    v***v

  7. S***r

    cumplió con el tiempo de entrega.

    S***r

  8. F***a

    The carabiner is very heavy, heavier than on ordinary leashes from the pet store, asked her husband to redo. In any case, for dogs 4-7kg it will be a heavy uncomfortable carabiner, and accordingly a leash.

    F***a

  9. I***o

    Доставка 2 недели в Ленобласть. Для лабрадора подошёл отлично.

    I***o

  10. Y***n

    Decent quality, I liked the sand and me

    Y***n