-5%

Durable Dog Tracking Leash Nylon Long Leads Rope Pet Training Walking Leashes 3m 5m 10m 20m For Medium Large Dogs Non-slip

(10 customer reviews)
Availability:

558 in stock


$17.08$35.90

Shipping:
This product can not be delivered to United States (US).
Ship to:

Shipping Method:
This product can not be delivered to United States (US).
Compare

Durable Dog Tracking Leash Nylon Long Leads Rope Pet Training Walking Leashes 3m 5m 10m 20m For Medium Large Dogs Non-slip

Color: Coffee/Beige

Size: 3m/5m/10m/20m

Sturdy metal swivel hook,compliment any collar or harness

These extra long training leash are designed for Long distance training.

Works great for tracking work like searching/hunting or training like recall/distance commands. And more freedom of movement on Long-distance outdoor activities.

Size:

SKU: LQCMRU1M6H79 Category:

Based on 10 reviews

4.8 overall
8
2
0
0
0

Add a review

  1. Shopper

    Great leash! In winter, the snow will be well visible (I took a dark brown), for the summer we have khaki) light and durable!

    Shopper

  2. Z***s

    Excellent stuff

    Z***s

  3. A***o

    The leash is not very comfortable. He is round and cuts his hand with tension. After the first walk, the dog did not break. Threads cracked, but withheld.

    A***o

  4. P***k

    very high quality , strong and soft on hands

    P***k

  5. G***x

    Received quickly looks good quality 35 kg heavy duty dog hook

    G***x

  6. v***v

    good, looking strong.

    v***v

  7. S***r

    cumplió con el tiempo de entrega.

    S***r

  8. F***a

    The carabiner is very heavy, heavier than on ordinary leashes from the pet store, asked her husband to redo. In any case, for dogs 4-7kg it will be a heavy uncomfortable carabiner, and accordingly a leash.

    F***a

  9. I***o

    Доставка 2 недели в Ленобласть. Для лабрадора подошёл отлично.

    I***o

  10. Y***n

    Decent quality, I liked the sand and me

    Y***n